These days the attack of termites has become a major cause of concern among many families. Termites destroy all the wooden furniture and other related luxury items in the house. Their accumulation and survival is credited to the moist soil conditions below foundation level. Termites generally attack from below the earth surface. Therefore, per-construction treatment of soil becomes a necessity. However, post-construction treatment can also prove fruitful if given proper consideration.  

Termite brisbane requires a complex methodology, which is usually performed by experts. An unskilled person is advised not to execute this work because of the harmful chemicals involved in it. Proper Safety measures are required to be taken at every step. The chemical which is generally used for this purpose is known as chloral-pyrites. It is available in tin cans of 20 liter capacity that is supposed to be diluted proportionately with water. Generally, 1 part of the chemical is diluted with 4 parts of water. Besides, it is recommended to avoid any physical contact with the chemical because it may produce burning sensation or rashes on the exposed parts of skin. Polyurethane gloves should be bought before commencing this operation.

Pr-construction technique involves pouring of the chemical mixture into the soil by drilling holes of 100 millimeter diameter up to a depth of minimum 500 millimeters, separated at a center to center distance of 600 millimeters. The chemical is poured till the saturation point is observed in the soil. It can simply be done with the help of a mug or a jar.

Post-construction technique is a bit skillful and it involves use of power drilling tools to complete the job. Holes of 50 millimeter diameter are drilled to a depth of 300 millimeter at an angle of 45 degrees at the junction of wall and floor. The angle has to be maintained because it ensures maximum area coverage. The chemical is poured with the help of a pressure injecting needle. Nearly, 20 liter of concentrated chemical can cover an area of 50 square yards. The holes are later blocked by a good mortar mix or sealant. This will inhibit termite accumulation inside the house for at least 5 years. After the treatment, the house must be left vacant for a minimum of 3 days because the harmful chemical fumes can lead to suffocation or even death.

For more information please visit: brisbane pest control



Leave a Reply.